Plant Projects

 

Summer Projects 2018

  • Bonaventure Hall replace domestic hot water system 
  • Canticle roof replacement
  • Fine Arts Center replace loading dock
  • Fine Arts Center exterior tuckpointing
  • Fine Arts Center replace cooling tower fill
  • Fine Arts Center rigging inspection
  • Fine Arts Center counter weight rigging system overhaul
  • Amie Mathy Center replace air handling unit fan motor
  • Amie Mathy Center sand, paint and recoat floors
  • Murphy Center HVAC controls
  • Murphy Center roof flashing
  • Murphy Center tuckpointing
  • Reinhart Center cooling tower repairs
  • Reinhart Center air handling unit rebuild
  • Reinhart Center replace rocks in acid tanks
  • Rose Terrace replace stairwell landing doors (12)